Following demolition KO Plant and Groundworks returned to start work on the foundations.
Preparing the oversite before excavating the foundations. Ten grass courts also under construction
Setting out and excavating the foundations
Concrete for the mass foundations arrives
Steel reinforcement being installed on top of mass foundations in preparation for steel reinforcement. Also visible are four foundation pads with holding down bolts to take steel columns.